Acoustica EcoMat Overscreed 4.5mm
A 4.5 mm resilient acoustic mat laid over the screed, directly beneath the final floor finish, reducing impact sound transmission under a wide range of floor coverings. Produced from recycled car tyres and cork.
4.5 mmThickness
10 m²Per roll · 10 m × 1 m
Up to 19 dBAcoustic performance
0.75 togTog rating
Features
- Sustainable: made from cork and recycled car tyres
- Suitable with underfloor heating
- Resilient acoustic layer
- Low VOC (<0.01 mg/m³ TVOC)
Applications
Apartments, hotels, commercial developments and leisure developments.
Acoustic performance by floor finish
- Laminate: 19 dB
- Engineered wood: 18 dB
- Concrete subfloor (standalone): 18 dB
Specification
| Composition | Cork and recycled car tyres |
|---|---|
| Roll size | 10 m × 1 m (10 m²) |
| Thickness | 4.5 mm |
| Density | 730 kg/m³ |
| Roll weight | 33 kg |
| Tensile strength | >730 kPa |
| Elongation at break | >15% |
| Compression / recovery | 16% / >76% |
| Shore hardness | 40–60 Shore A |
| Tog rating | 0.75 |
| Operating temperature | −30 °C to 90 °C |
| Recommended adhesives | Engineered wood: Laybond MS, Bostik MK925 · Vinyl: Mapei VS90 Plus, F.Ball F44 · Linoleum: Mapei ECO 520 |
Installation at a glance
Preparation
- Screed or slab clean, dry, smooth, level and sound
- Check substrate moisture suits the floor finish and adhesive
- Acclimatise the mat on site for at least 24 hours
- Unroll beforehand to let it relax
Laying
- Dry-lay first to confirm the layout
- Bond with a compatible adhesive and roll firmly
- Tightly butted joints, never overlapped
- Don’t bridge movement or expansion joints
Finishing
- Let the adhesive cure before laying the floor finish
- Protect from traffic and moisture until finished
- A small trial area is recommended if in doubt
Need technical advice or a price?
Our team can help with installation support and product queries.
Call 07818 542495Email usAlways confirm adhesive compatibility with the adhesive manufacturer. Information is correct to the best of our knowledge; please contact us before starting works for the latest information.

